Soil stabilization is completed by following these steps:
- Investigate existing soil conditions
- Drive injection pipes to appropriate depths of soil strata
- Introduce water (if desired) to speed reaction time
- Pump single component soil stabilizer into soil
Refusal of a certain injection pressure or a specific measurement of volume placed can be used to determine adequate injection. Depending on the moisture content of the existing soil, the soil stabilizer will harden in as little as 2 hours. Catalyst may be used to further speed reaction time.







